Ground Breaking 7-20-08
9-16-08 Dirt work starts
Over 16000 yards of dirt needed to be moved.
Concrete work begins
10-23-08 Lots of rain with no where to go have created lake.
11-15-08 Concrete Floor work
11-18 work continues even though we've had less than perfect weather
11/24/08 Walls going up
12-2 Walls are Continuing to go up.
Framing continues 12/3/08
12-4 Pouring firewall footings
12/11 Pouring more concrete before the snow
12/16 Snow puts a stop to construction for a few days
12/30/08 interior walls are going up
12/30 starting to sheet outside walls
12/30 view from the road
1/6 picture from the road
1-16-09 truss work begins in the NE corner.
1-19-2009 after a bit of snow dining room walls are being constructed.
1-21-09 roof work
1-26-09 weather again slow progress
1-30-09 closed in
1-30-09 walls continue to go up
2-5-09 roof work on the south units
2-6-09 roof over the main dining room
2-12-09 truss work on the SW side
2-12-09 enclosed NE corner of the courtyard
2-12-09 inside work on the NE units
2-13-09 view from the First street bridgel
2-18-09 Southside rooms get dried in
2-20-09 Entrance work begins. Note the raised walls on the right with windows in them.
3-4-09 Activity and Dining room taking shape.
3-4-09 Dining room area.
3-4-09 Sheetrocking in the north resident rooms.
3-9-09 Main Entrance work continues.
4-1-09 Main entrance is taking shape.
4-1-09 High ceilings and lots of windows in the lobby.
4-15-09 Lobby Area
4-21-09 Paving of County Rd M in fornt of the facility.
4-21-09 Concrete work on parking and street
5-5-09 Siding installed on the new building.
5-5-09 Street completed and now open.
5-5-09 main entrtance is taking shape.
5-14-09 courtyard work continues
5-14-09 Painting and finish work.
5-22-09 Work on the dining room fireplace
6-4-09 Spa room gets tile on walls and floor
6-4-09 Courtyard landscape goes in.
6-19-09 outside taking shape
6-19-09 Green grass in the Randall Smith Memorial Courtyard
7-7-09 Resident room entrance.
7-14-09 Laundry room for the residents.
7-14-09 Courtyard area nearly complete.
7-14-09 Landscape work begins in the front of the building.
7-28-09 New sign has been installed
Chapel
Resident Laundry Room
Sitting Area in Courtyard Terrace
Spa Room @ Courtyard Terrace
Private Dining Room at Courtyard Terrace
Front reception Area
Reception Desk
Billiards Room
Sitting Area of Billiards
Refreshment center
Fireplace in main dining room
Courtyard Garden
Courtyard Terrace Patio Area
Courtyard Kitchen
Main Dining Room
view 2 of Main Dining Room
Library and Media room